The Ministry of New and Renewable Energy (MNRE) has made updates to the Approved List of Models and Manufacturers (ALMM) by adding five new entrants. These manufacturers, namely SAEL, Rhine Solar, Spark Solar, Genus Innovation, and Fujiyama Power Systems, have a combined module manufacturing capacity of 343 MW. With these additions, the ALMM now consists of 82 module manufacturers with a total listed module capacity of 19.19 GW. Notably, there are no Chinese manufacturers on the list.
The ALMM only includes models with a module efficiency of 19% or higher in List-1. Manufacturers whose model validity expired on March 9, 2023, and did not apply for renewal have been delisted. The ministry recently revised the ALMM guidelines, allowing exceptions to the qualification criteria for modules produced under agreements between original equipment manufacturers and brand owners. The revised rules state that if an applicant has multiple manufacturing sites or sources finished products from other manufacturers under their own brand name, all manufacturing sites must be inspected unless an exception applies.
The government had initially put the implementation of the ALMM order for the financial year 2023-24 on hold, but later modified the rules. Consequently, solar projects commissioned by March 31, 2024, will be exempted from the requirement of procuring modules listed under the ALMM.
Furthermore, the MNRE clarified last October that open access and net metering renewable energy projects that had applied for approval before October 1, 2022, would not be subject to the ALMM. Additionally, the ALMM mandate does not apply to behind-the-meter solar power projects used for captive consumption by individual consumers or groups of consumers.
Suggested Articles

GHI vs DNI Explained: Understanding Solar Radiation for Better Solar System Design
GHI and DNI are two critical solar radiation parameters used in designing efficient solar power systems. This guide explains the difference between GHI vs DNI, how each is measured, and why understanding them is essential for accurate solar system design and performance estimation.

Civil Structural General Arrangement (GA) Drawing in Solar Projects: Complete Design & Layout Guide
A Civil Structural General Arrangement (GA) drawing in solar projects is a detailed layout that defines the placement of solar modules, mounting structures, inverters, and civil foundations. It plays a crucial role in ensuring accurate design, optimal space utilization, and smooth execution of both rooftop and ground-mounted solar installations. This guide explains the key components, design considerations, and best practices for creating effective GA drawings in solar EPC projects.

Solar PPA for Commercial Buildings: Cost, Benefits & Savings
Looking to cut electricity bills without investing in solar assets? Commercial Solar PPA providers offer zero-investment solar solutions where businesses pay only for the power generated—simple, risk-free, and cost-effective.

How to Check Materials Received on Site for Solar PV Projects: Complete Inspection Checklist
Ensuring the quality of materials received at site is critical for successful solar PV installation. This guide provides a detailed inspection checklist to verify solar components before installation.

100 kW Solar Power Plant Cost in Haryana: The Ultimate Guide to the Best Rate Per Watt
Explore the 100 kW solar power plant cost in Haryana for 2025. Learn about pricing, government subsidy options, and how much you can save with solar energy.

India Raises Solar Purchase Obligation (SPO) to 8%: A Complete Guide
The Solar Purchase Obligation (SPO) in India is set to increase to 8%, pushing companies to adopt more solar energy. This guide explains the implications for businesses, compliance strategies, and how organizations can align with renewable energy targets.

Top Solar Companies & Suppliers in Delhi/NCR – A Complete Guide
Looking for trusted solar panel suppliers in Delhi/NCR? Explore leading solar companies serving Gurgaon, Noida, Faridabad, Manesar, and Ghaziabad. Compare product quality, technology, and services to choose the right solar partner for your home, business, or factory.

How to Read the Electricity Bill Before Deciding Solar Plant Capacity
Load assessment is an essential step before installing a solar PV system. It helps determine electricity consumption and ensures accurate system sizing for optimal solar performance.