Latest MNRE List: Approved Solar Module Manufacturers
Latest MNRE List: Approved Solar Module Manufacturers
The Ministry of New and Renewable Energy (MNRE) has made updates to the Approved List of Models and Manufacturers (ALMM) by adding five new entrants. These manufacturers, namely SAEL, Rhine Solar, Spark Solar, Genus Innovation, and Fujiyama Power Systems, have a combined module manufacturing capacity of 343 MW. With these additions, the ALMM now consists of 82 module manufacturers with a total listed module capacity of 19.19 GW. Notably, there are no Chinese manufacturers on the list.
The ALMM only includes models with a module efficiency of 19% or higher in List-1. Manufacturers whose model validity expired on March 9, 2023, and did not apply for renewal have been delisted. The ministry recently revised the ALMM guidelines, allowing exceptions to the qualification criteria for modules produced under agreements between original equipment manufacturers and brand owners. The revised rules state that if an applicant has multiple manufacturing sites or sources finished products from other manufacturers under their own brand name, all manufacturing sites must be inspected unless an exception applies.
The government had initially put the implementation of the ALMM order for the financial year 2023-24 on hold, but later modified the rules. Consequently, solar projects commissioned by March 31, 2024, will be exempted from the requirement of procuring modules listed under the ALMM.
Furthermore, the MNRE clarified last October that open access and net metering renewable energy projects that had applied for approval before October 1, 2022, would not be subject to the ALMM. Additionally, the ALMM mandate does not apply to behind-the-meter solar power projects used for captive consumption by individual consumers or groups of consumers.
Suggested Articles

Safe Work Procedures for Solar PV Systems Guide
A complete guide to establishing and following safe work procedures in solar PV systems, ensuring worker safety during installation, testing, commissioning, operation, and maintenance.

100 kW Solar Power Plant in Indore – Latest Cost, Subsidy & Payback Period
A 100 kW solar plant in Indore costs around ₹40–55 lakh in, offering annual savings of up to ₹10 lakh and a payback period of 4–6 years. Learn about installation, maintenance, and ROI to make your solar investment worthwhile.

Utility Disconnect Installation in Solar PV Systems Guide
A step-by-step guide to utility disconnect installation in solar PV systems, including wiring, safety measures, and installation best practices.

Open Circuit Voltage (Voc) Testing Guide for Solar PV Systems
A complete guide to measuring open circuit voltage (Voc) in solar PV systems, including testing procedures, safety guidelines, and performance evaluation techniques.
India’s Solar Capacity Growth Slows Down in Q1 2023
India’s solar capacity growth slowed in Q1 2023. Explore the factors behind the slowdown and its impact on the country’s renewable energy progress.

Difference Between Inverter and Solar Inverter: A Complete Comparison
Confused between an inverter and a solar inverter? This guide explains their key differences, working principles, advantages, and which option is best for your home or business.

Inverter Operation and Anti-Islanding Testing Guide
A complete guide to solar inverter testing and anti-islanding performance verification, including AC system measurements and commissioning best practices.

How to Check Solar PV Modules for Physical Damage
A complete guide on how to clean solar PV modules, including safe cleaning techniques, recommended tools, maintenance schedules, and best practices to maximize energy output.