Intentional Islanding in solar
Intentional Islanding in solar occurs when a solar rooftop system continues to supply to a load even when the grid is down; this can be very dangerous. Therefore, when the grid is down, the inverter, used in the rooftop system solar power plant for generating solar energy for home/industrial/commercial roof top, stops supplying power.
Intentional Islanding in solar is a technical requirement for inverters strictly mandated by CEA and MNRE. However, in view of frequent grid outages in most States, particularly in industry, commercial and institutional establishments, the rooftop system should be able to disconnect from the grid. Thus system should supply continuously solar power to the loads of such establishments using a battery storage system or in synergy with the backup diesel generator. Otherwise, the solar power will be wasted.
Intentional Islanding in Solar Option 1
Intentional Islanding in solar is possible through additional advanced features to be provided in inverters. The hybrid inverter which could work in the off-grid mode and continue to charge batteries with generated power. The inverter can continue to function in grid-tied mode in synergy with the larger backup diesel generator.
Intentional Islanding in Solar Option 2
Generally, for most industrial, commercial and institutional establishments, the second option is more feasible as they have large existing backup diesel generators for their loads. Such backup facilities already have the required safety features which prevent reverse flow to the grid.
Rooftop solar with the right type of inverter is, therefore, technically feasible even when the grid is down, and can also be more cost-effective compared to costlier diesel generation.
For harnessing the full potential of rooftop solar as envisioned by Government, CEA and MNRE should consider allowing such ‘intentional islanding in solar’ rooftop projects. They should formulate technical specifications of inverters with such additional advanced features for automatic and safe operation.
Ref: Grid Integration of Distributed Solar Photovoltaics (PV) in India, Prayas Energy Group, 2014
Suggested Articles

Minimum Land Requirement for Solar Power Plants in India
Understanding the land requirement for solar plant projects in India is essential for accurate planning and approvals. This article explains minimum land needed per kW and MW, key influencing factors, and differences between rooftop and ground-mounted solar plants.

Haryana and UP Face Delays in Solar Net Metering Approvals
Net metering for rooftop solar in Haryana and Uttar Pradesh faces procedural delays, affecting solar adoption and efficiency for residential and commercial consumers

Data Acquisition System Calibration in Solar PV Plants
A complete guide to solar PV data acquisition system calibration, ensuring accurate monitoring, reliable data collection, and effective performance analysis.

Solar Inverter Wire Connection Inspection Guide
A complete guide to inspecting solar inverter wire connections, identifying damaged cables, loose terminals, and ensuring safe, efficient, and reliable solar PV system operation.

Case Study: Successful Design, Installation, and Commissioning of a 50 kWp Rooftop Solar PV Plant
This case study details our experience in designing, installing, and commissioning a 50 kWp solar PV rooftop power plant. Learn how we overcame technical challenges, optimized system performance, and delivered clean, reliable energy. Discover insights on panel selection, inverter sizing, monitoring, and commissioning processes that ensured maximum efficiency and long-term performance for the rooftop solar installation.

Hydrometer Testing for Solar Battery State of Charge
A complete guide to hydrometer testing for solar battery state of charge, helping assess battery health, performance, and maintenance needs.

How to Check Solar PV Modules for Physical Damage
A complete guide on how to clean solar PV modules, including safe cleaning techniques, recommended tools, maintenance schedules, and best practices to maximize energy output.

500 kW Solar Power Plant Cost in UP 2025 | Latest Price, Subsidy & ROI
Thinking of setting up a 500 kW solar power plant in Uttar Pradesh? Discover the 2025 cost estimate, available subsidies, and expected ROI. Learn how commercial and industrial projects in UP can reduce energy expenses and achieve long-term savings with solar energy.