Skip to main content

Smart Roof Solar

Handshake Light Streamline Icon: https://streamlinehq.com

TRUSTED BY

1000+ Happy Clients
800+ Completed Projects
150+ MW Capacity Delivered

Certificate Light Streamline Icon: https://streamlinehq.com

CERTIFICATION

ISO 9001:2015
ISO 45001:2018
ISO 14001:2015

UP Government Incentive: Stamp Duty Exemption for Solar Land

UP Government Incentive: Stamp Duty Exemption for Solar Land

 

Solar developers will be exempted from paying any Stamp Duty for land acquired or leased for solar projects and solar parks in Uttar Pradesh.

The Uttar Pradesh government has announced the 100% exemption on stamp duty as per the state’s Solar Energy Policy 2022.

The stamp duty exemption could help solar capacity additions in the state where land acquisition has been a major challenge.

Solar parks need large areas of continuous land. Several cases of land acquisition have faced problems with local authorities, landowners, and government agencies, which lead to higher costs for developers and make projects unfeasible.

The stamp duty exemption will be applicable after the district magistrate or the Deputy Commissioner of Industries confirmation. They have to confirm that the deed is being executed under the Uttar Pradesh Solar Policy 2022.

At the time of registering the land deed, developers are required to present the irrevocable bank guarantee of the amount equivalent to the remission of the stamp duty in favor of the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA).

The validity of the bank guarantee must be at least the time prescribed to complete the project.

However, units that have obtained the stamp duty exemption benefit under any other policy will not be eligible for a similar exemption under the Solar Policy.

Last November, the Uttar Pradesh government approved the ‘Solar Energy Policy, 2022,’ revising its target upwards to 22 GW of solar capacity by FY 2026-27.

The state had proposed a 16 GW solar capacity target in its draft policy earlier last year. The approved target capacity includes 14 GW of utility-scale power projects, 6 GW of rooftop solar projects, and 2 GW of distributed solar projects.

UPNEDA has been designated the nodal agency for implementing the policy.

Suggested Articles

Solar Shingle

Should You Replace Solar Panels with Solar Shingles?

Discover how solar batteries store excess energy, maximize your solar system’s efficiency, and provide reliable power during outages. Learn about the types, benefits, lifespan, and maintenance tips to make the most of your solar investment.

net metering in depth

Difference Between Single-Phase and Three-Phase Voltage and Its Use for Solar PV Installer – Complete Guide

Understanding the difference between single-phase and three-phase voltage is essential for solar PV installers. While single-phase supply is common in residential systems, three-phase power is widely used in commercial and industrial solar projects. This complete guide explains electrical phase differences, applications in solar installations, and how choosing the right phase connection impacts system efficiency, safety, and performance.

C&I Solar Installation Company Complete Guide for Commercial & Industrial Solar Projects in India

New IREDA Loan Scheme for Solar Rooftop Projects: Benefits, Eligibility & Interest Rates

India’s renewable energy push gets a major boost with the new IREDA loan scheme for solar rooftop projects. This scheme offers low-interest financing, simplified approvals, and better support for residential, commercial, and industrial consumers. Here’s a detailed look at its benefits, eligibility, interest rates, and how to apply for funding.

pic_vsm_food3

Higher Electricity Bills in Haryana as Fuel Surcharge Rises

Haryana consumers are facing higher electricity bills after the Haryana Electricity Regulatory Commission (HERC) approved a fuel surcharge hike for DHBVN and UHBVN areas. The increase reflects rising fuel and power purchase costs, directly impacting domestic, commercial, and industrial users across the state.

Contact Us