Good Solar Installation
Solar Panels:
A lot of duplicate panels , used in solar power plant for generating solar energy for home/industrial/commercial roof top or ground mounted ,are available in the market and cheaper solutions use the same. In absence of customer knowledge on the subject they are taken for a ride . To avoid malpractice , customers should insist on seeing the panel sl no via a RFID reader , which we are sure the vendor should have . And if some vendor says that he does not have a RFID reader then please avoid getting systems installed by such vendors.
Design based on proper survey:
Avoiding inter row shadows and other shadows , even if size of the plant reduces.It is observed that in many cases the owner decides that he wants XXX KWp solar plant and at actual site XXX installation is not feasible but even then a lot of installers install XXX by reducing inter row gap resulting in lower generation of power.
Array Design:
Arrays should be designed taking into consideration the max and min voltage expected and input voltage permissible for the particular inverter used at site.
Cables:
Proper cables should be used tinned cu solar cables for DC side and Cu cables for AC side. If vendor uses Cu cables on DC side also then there may be no immediate effect but in due course of time generation will be effected.
Structure:
Now a days a lot of vendors are using pre galvanized sheets for fabrication of structure, which is not desirable. In fact the structure should be fabricated with MS and then hot dip galvanization should be resorted to for longevity of structure life. Even with pre Gal sheet there will be no immediate impact on performance but 5-7 yrs down the line it will get rusted and may break leading to accident.
Earthings:
There should be minimum two earthings , separately for DC and AC networks.
LA:
LA is must because solar panels are prone to attract lightening.
Protections:
Unless otherwise AC and DC side protections are installed either in ACDB/AJB/Inverters , one should not commission the solar plant. There are various models of inverters of the same capacity. Cheaper ones do not have protections and they need to be provided in AJB/ACDB’s . One needs to be careful .Cost of SPD’s are significant and vendors tend to avoid the same either out of ignorance or for cost considerations.
Data Monitoring:
Generation from your plant needs to be monitored and vendors are supposed to be monitoring the same. Customer before placing order should insist on seeing the control centers of the vendors and if the vendors does not have such a control center then avoid doing business with such players.
Suggested Articles

Should You Replace Solar Panels with Solar Shingles?
Discover how solar batteries store excess energy, maximize your solar system’s efficiency, and provide reliable power during outages. Learn about the types, benefits, lifespan, and maintenance tips to make the most of your solar investment.

Perovskite: Future of Solar Cells
Discover how solar batteries store excess energy, maximize your solar system’s efficiency, and provide reliable power during outages. Learn about the types, benefits, lifespan, and maintenance tips to make the most of your solar investment.

EIB Green Hydrogen India: €1 Billion Investment to Boost Clean Energy Transition
The European Investment Bank (EIB), the bank of the European Union, has joined forces with the India Hydrogen Alliance (IH2A) to increase support for the development of green hydrogen projects across India.

How to Calculate PV Power Output? Step-by-Step Guide
Calculating PV power output helps you estimate how much electricity a solar system can generate. This step-by-step guide explains the PV power output formula, examples, and key factors affecting solar energy production.

Fall Protection for Solar PV Systems
A complete guide to inspecting and installing fall protection systems for solar PV projects, helping protect workers during rooftop installation, maintenance, and other work at height.

OPEX Industrial Solar Provider in India: How It Works, Cost & ROI
An OPEX industrial solar provider installs and owns the solar plant while industries pay only for energy used. Learn cost, benefits, and ROI in India.

How to Assess Customer Requirements Before Solar Installation
Understanding customer requirements is essential before installing a solar plant. This guide explains key assessment methods such as energy analysis, site survey, and feasibility evaluation.

Electrical Wiring Requirements Before Installing a Solar Power System
Before designing a solar power system, assessing the building’s electrical wiring is essential. Proper inspection ensures the wiring can safely handle solar power integration, prevents electrical risks, and improves overall system efficiency.