UP Government Incentive: Stamp Duty Exemption for Solar Land
UP Government Incentive: Stamp Duty Exemption for Solar Land
Solar developers will be exempted from paying any Stamp Duty for land acquired or leased for solar projects and solar parks in Uttar Pradesh.
The Uttar Pradesh government has announced the 100% exemption on stamp duty as per the state’s Solar Energy Policy 2022.
The stamp duty exemption could help solar capacity additions in the state where land acquisition has been a major challenge.
Solar parks need large areas of continuous land. Several cases of land acquisition have faced problems with local authorities, landowners, and government agencies, which lead to higher costs for developers and make projects unfeasible.
The stamp duty exemption will be applicable after the district magistrate or the Deputy Commissioner of Industries confirmation. They have to confirm that the deed is being executed under the Uttar Pradesh Solar Policy 2022.
At the time of registering the land deed, developers are required to present the irrevocable bank guarantee of the amount equivalent to the remission of the stamp duty in favor of the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA).
The validity of the bank guarantee must be at least the time prescribed to complete the project.
However, units that have obtained the stamp duty exemption benefit under any other policy will not be eligible for a similar exemption under the Solar Policy.
Last November, the Uttar Pradesh government approved the ‘Solar Energy Policy, 2022,’ revising its target upwards to 22 GW of solar capacity by FY 2026-27.
The state had proposed a 16 GW solar capacity target in its draft policy earlier last year. The approved target capacity includes 14 GW of utility-scale power projects, 6 GW of rooftop solar projects, and 2 GW of distributed solar projects.
UPNEDA has been designated the nodal agency for implementing the policy.
Suggested Articles

Safe Work Procedures for Solar PV Systems Guide
A complete guide to establishing and following safe work procedures in solar PV systems, ensuring worker safety during installation, testing, commissioning, operation, and maintenance.

How to Prepare Battery Terminals and Install Interconnection Cables
Proper battery terminal preparation and cable installation are essential for safe and efficient battery bank operation. This guide explains the complete installation process for solar projects.

How DISCOMs Implement Net Metering for Solar Power Plants
Discover the process of net metering implementation by DISCOMs for solar power plants. Understand the benefits, billing mechanism, and how it maximizes solar energy utilization.

Delhi Government Pledges to Boost Renewable Energy Generation
Delhi, the capital city of India, is moving towards a greener future with an ambitious plan to generate an additional 6,000 MW of electricity using renewable energy sources.

Renewable Energy Hits New Heights: 440 GW Capacity in 2023
Learn how global renewable energy capacity is set to surpass 440 GW in 2023, marking record growth and a major shift toward clean, sustainable power.

Developers fear unfair state-specific levies will make solar more expensive
Developers in India are concerned that state-specific levies on solar projects could increase costs, slow adoption, and impact the growth of renewable energy across residential, commercial, and industrial sectors.

1 MW Solar Plant for Industry: Cost, Generation & Payback
A detailed guide on 1 MW solar plant for industry covering installation cost, area requirement, power generation, ROI, and long-term savings in India.

Haryana and UP Face Delays in Solar Net Metering Approvals
Net metering for rooftop solar in Haryana and Uttar Pradesh faces procedural delays, affecting solar adoption and efficiency for residential and commercial consumers