Crystalline silicon photo voltaic (PV) technology has given consistent performances in Indian conditions over the years. Limited experience with thin film technology has provided good performance in Rajasthan but slightly lower in other Indian Northern States compared to crystalline technology.
Selection of best solar panel
The reported annual degradation in performance of crystalline silicon panels is in the range of 0.8-1.0 % being slightly higher for thin film panels and at high temperature and humidity locations. It could also be slightly higher in the beginning, then steadies out. Best solar panel can provide over 90% performance after 10 years and 80% performance after 20 years over its life of 25 years. A few modules may need replacement at high voltage terminal end but limited to about 2 kW in a 100 kW array at the end of 10 years.
However, caution may need to be exercised as few domestic panel manufacturers have been facing the problem of PID (potential induced degradation) which can lead to much lower performance than expected.
The performance of best solar panel also depends on the system voltage apart from the temperature and the humidity. Higher the voltage, lower are the losses. Up to 5 kW systems, one should go for a voltage of 48 volts; up to 10 kW for 96 volts; and, for other rooftop systems 240 volts or higher.
Ask for the performance test certification of the modules from the manufacturers. NISE (National Institute of Solar Energy) under MNRE, Government of India, and other private sector agencies like UL (Underwriters Labs) and TUV are the key agencies providing certification. If you are going for a larger installation, ask for the random testing of say 5% of the modules. For example, a 100 kW system would require around 400 modules of 250 watts. So, the manufacturers should provide the test results at the factory premises for, say, 20 randomly selected modules.
Most of the PV modules available in the market today provide an efficiency of 14 – 15% though the peak performing panels are reported to have efficiency of over 18%. However, efficiency is not very critical as the module will provide its rated power output but the size of the module will be larger and occupy more roof space if the efficiency is lower.
A 250 watt module of 14% efficiency will occupy a roof space of around 1.8 square meters. The total roof space required for, say, a 10 kW installation comprising 40 modules of 250 watts, allowing for spacing between the arrays, will vary from 80-100 square meters, depending on the roof.
Check out the number of units generated by the solar power plants that may have been set up near your location. It would provide a broad indication of the solar radiation available as well as the observed solar generation in your area.
Suggested Articles

Industrial Solar Power: 7 Reasons to Make the Switch
Top 7 benefits of solar energy for industries, including cost savings, environmental impact, and improved energy reliability.

Steps Required for Conducting a Site Assessment Prior to Solar Installation
A solar site assessment helps installers evaluate location, shading, structure, and energy requirements before installation. This guide explains the essential steps for accurate solar system planning.

Solar PV Battery Types: Complete Installer Guide
A complete guide to the types of batteries used in solar PV systems, helping installers and solar professionals choose the right energy storage solution.

Essential Tools for PV System Testing Guide
A complete guide to battery bank enclosure and rack installation, including site verification, setup procedures, and safety practices for solar PV systems.

Should You Switch to Solar in India? Complete Guide
India has become a hot-selling solar market and people are interested in installing solar systems in their homes as well as in industries and factories.

How to Check Materials Received on Site for Solar PV Projects: Complete Inspection Checklist
Ensuring the quality of materials received at site is critical for successful solar PV installation. This guide provides a detailed inspection checklist to verify solar components before installation.

Top 10 Sustainable Building Practices to Consider for Your Construction Business
The construction industry is embracing sustainability like never before. From smart design to renewable energy use, these top 10 practices ensure businesses stay competitive, compliant, and environmentally responsible.

UP Discoms Propose 9.21% Electricity Tariff Hike for 2015-16
Uttar Pradesh Discoms propose a 9.21% increase in electricity tariffs for 2015-16, impacting residential, commercial, and industrial consumers across the state.