Best Solar Panels for Rooftop Projects: How to Choose the Right One
Best Solar Panels for Rooftop Projects: How to Choose the Right One
Crystalline silicon photo voltaic (PV) technology has given consistent performances in Indian conditions over the years. Limited experience with thin film technology has provided good performance in Rajasthan but slightly lower in other Indian Northern States compared to crystalline technology.
Selection of best solar panel
The reported annual degradation in performance of crystalline silicon panels is in the range of 0.8-1.0 % being slightly higher for thin film panels and at high temperature and humidity locations. It could also be slightly higher in the beginning, then steadies out. Best solar panel can provide over 90% performance after 10 years and 80% performance after 20 years over its life of 25 years. A few modules may need replacement at high voltage terminal end but limited to about 2 kW in a 100 kW array at the end of 10 years.
However, caution may need to be exercised as few domestic panel manufacturers have been facing the problem of PID (potential induced degradation) which can lead to much lower performance than expected.
The performance of best solar panel also depends on the system voltage apart from the temperature and the humidity. Higher the voltage, lower are the losses. Up to 5 kW systems, one should go for a voltage of 48 volts; up to 10 kW for 96 volts; and, for other rooftop systems 240 volts or higher.
Ask for the performance test certification of the modules from the manufacturers. NISE (National Institute of Solar Energy) under MNRE, Government of India, and other private sector agencies like UL (Underwriters Labs) and TUV are the key agencies providing certification. If you are going for a larger installation, ask for the random testing of say 5% of the modules. For example, a 100 kW system would require around 400 modules of 250 watts. So, the manufacturers should provide the test results at the factory premises for, say, 20 randomly selected modules.
Most of the PV modules available in the market today provide an efficiency of 14 – 15% though the peak performing panels are reported to have efficiency of over 18%. However, efficiency is not very critical as the module will provide its rated power output but the size of the module will be larger and occupy more roof space if the efficiency is lower.
A 250 watt module of 14% efficiency will occupy a roof space of around 1.8 square meters. The total roof space required for, say, a 10 kW installation comprising 40 modules of 250 watts, allowing for spacing between the arrays, will vary from 80-100 square meters, depending on the roof.
Check out the number of units generated by the solar power plants that may have been set up near your location. It would provide a broad indication of the solar radiation available as well as the observed solar generation in your area.
Suggested Articles

Solar String Sizing Check: Did Your Installer Get It Right?
Worried your rooftop solar strings might be sized incorrectly? Check these tips to ensure your Solar PV system is installed for maximum efficiency and safety

Solar PV Mounting Structures: Types & Installation Guide
A complete guide to solar mounting structures types in PV systems, covering fixed tilt, tracking, and rooftop installations for installers.

AC Combiner Box Installation in Solar PV Systems Guide
A step-by-step guide to AC combiner box installation in solar PV systems, covering setup, wiring, and safety best practices.

Ground Mounted Solar Systems: Complete Guide for Commercial & Industrial Projects in India
Ground mounted solar systems are ideal for commercial and industrial projects with available land. This guide explains cost, land requirement, installation process, and ROI in India.

Everything You Should Know About Solar Batteries
Discover how solar batteries store excess energy, maximize your solar system’s efficiency, and provide reliable power during outages. Learn about the types, benefits, lifespan, and maintenance tips to make the most of your solar investment.

India and Japan Strengthen Renewable Energy Cooperation
India and Japan have initiated a partnership under the Asia Energy Transition Initiative (AETI) to support India’s clean energy transition. India has set an ambitious target of achieving net-zero by 2070, while Japan aims to achieve the same by 2050.

Grid-Connected Solar PV System Startup Guide
A complete guide to starting up a grid-connected solar PV system, including commissioning, grid synchronization, electrical safety checks, and operational verification.

Delhi charges one of the highest tariffs for commercial load and industrial – average over Rs 10.00 per kWh
Delhi imposes some of the highest electricity tariffs for commercial and industrial consumers, averaging over ₹10 per kWh, impacting businesses and operating costs