1000+ Happy Clients
ISO 9001/2008
enquiry@gosmartroof.com
+91 9599474141
| 1. Size of Power Plant | |
| Feasible Plant size as per your : | kW |
| 2. Cost of the Plant : | |
| MNRE current Benchmark Cost (without GST) : | Rs. Rs. / kW |
| View Benchmark Cost List | |
| Without subsidy (Based on current MNRE benchmark without GST) : | Rs. |
| With subsidy (Based on current MNRE benchmark without GST) : | Rs. |
| 3. Total Electricity Generation from Solar Plant : | |
| Annual : | kWh |
| Life-Time (25 years): | kWh |
| 4) Financial Savings : | |
| a) Tariff @ Rs./ kWh (for top slab of traffic) - No increase assumed over 25 years : | |
| Monthly : | Rs. |
| Annually : | Rs. |
| Life-Time (25 years) : | Rs. |
| Carbon dioxide emissions mitigated is | tonnes. |
| This installation will be equivalent to planting |
Teak trees over the
life time.
(Data from IISc)
|
|
Disclaimer: The calculation is indicative in nature. Generation may vary from location to location. |
for Loan amount of Rs. for loan period of years @ % is Rs. / month