Poor vs Good Solar Installation: Key Differences Explained
Poor vs Good Solar Installation: Key Differences Explained
Good Solar Installation
Solar Panels:
A lot of duplicate panels , used in solar power plant for generating solar energy for home/industrial/commercial roof top or ground mounted ,are available in the market and cheaper solutions use the same. In absence of customer knowledge on the subject they are taken for a ride . To avoid malpractice , customers should insist on seeing the panel sl no via a RFID reader , which we are sure the vendor should have . And if some vendor says that he does not have a RFID reader then please avoid getting systems installed by such vendors.
Design based on proper survey:
Avoiding inter row shadows and other shadows , even if size of the plant reduces.It is observed that in many cases the owner decides that he wants XXX KWp solar plant and at actual site XXX installation is not feasible but even then a lot of installers install XXX by reducing inter row gap resulting in lower generation of power.
Array Design:
Arrays should be designed taking into consideration the max and min voltage expected and input voltage permissible for the particular inverter used at site.
Cables:
Proper cables should be used tinned cu solar cables for DC side and Cu cables for AC side. If vendor uses Cu cables on DC side also then there may be no immediate effect but in due course of time generation will be effected.
Structure:
Now a days a lot of vendors are using pre galvanized sheets for fabrication of structure, which is not desirable. In fact the structure should be fabricated with MS and then hot dip galvanization should be resorted to for longevity of structure life. Even with pre Gal sheet there will be no immediate impact on performance but 5-7 yrs down the line it will get rusted and may break leading to accident.
Earthings:
There should be minimum two earthings , separately for DC and AC networks.
LA:
LA is must because solar panels are prone to attract lightening.
Protections:
Unless otherwise AC and DC side protections are installed either in ACDB/AJB/Inverters , one should not commission the solar plant. There are various models of inverters of the same capacity. Cheaper ones do not have protections and they need to be provided in AJB/ACDB’s . One needs to be careful .Cost of SPD’s are significant and vendors tend to avoid the same either out of ignorance or for cost considerations.
Data Monitoring:
Generation from your plant needs to be monitored and vendors are supposed to be monitoring the same. Customer before placing order should insist on seeing the control centers of the vendors and if the vendors does not have such a control center then avoid doing business with such players.
Suggested Articles

Rooftop Solar: Reduce Your Electricity Bill and Increase Savings
Discover how installing a rooftop solar system can help you save on electricity bills, reduce peak demand charges, and take advantage of government incentives.

Net Metering and its Advantages
Net Metering allows solar panel owners to feed excess electricity back to the grid and earn credits, reducing energy bills. Learn the key advantages of net metering for homes and businesses.

Get a Customized Industrial Solar Quote for Your Manufacturing Unit
Request a customized industrial solar quote in India. Know pricing, savings, payback & EPC scope for your factory solar project.

Difference Between Solar Power and Photovoltaic: Explained Simply
Total solar PV power represents the combined power output of a solar photovoltaic system. This guide explains its meaning, calculation, and how it directly impacts solar performance, efficiency, and long-term energy generation.

Solar Farm Development: Overcoming the Rising Challenge of Wiring Costs
Wiring costs are soaring in solar farms, affecting project budgets and timelines. Learn why infrastructure is becoming a key challenge.

EIB Green Hydrogen India: €1 Billion Investment to Boost Clean Energy Transition
The European Investment Bank (EIB), the bank of the European Union, has joined forces with the India Hydrogen Alliance (IH2A) to increase support for the development of green hydrogen projects across India.

Solar Projects Challenges in India: Module Supply Shortages and Policy Delays Slow Growth
India’s utility-scale solar projects face delays due to module supply shortages and policy challenges, impacting the growth of renewable energy.

1 MW Solar Power Plant Cost in Madhya Pradesh | A Complete Industrial Solar Guide
A detailed guide on the cost of setting up a 1 MW solar power plant in Madhya Pradesh. Learn about pricing, EPC components, land requirements, subsidies, and expected payback for commercial and industrial users.