BOOT vs PPA Explained: Find the Best Way to Finance Your Solar Plant
BOOT vs PPA Explained: Find the Best Way to Finance Your Solar Plant
As solar adoption grows across India, more businesses, industries, institutions, and large consumers are shifting from traditional ownership models to smart financing options. Two of the most widely used mechanisms in 2025 are the PPA & BOOT Solar Models.
Both models help organizations reduce upfront solar installation cost, enjoy clean solar electricity, and make solar energy economical without worrying about maintenance or equipment ownership. But the way they operate, and the long-term benefits, vary significantly.
This blog breaks down both models in simple language to help you choose what’s best for your energy needs.
What is the PPA (Power Purchase Agreement) Model?
A Power Purchase Agreement (PPA) is a long-term contract between the consumer and a solar developer.
Under this model:
- The developer installs, owns, and operates the solar plant on your premises.
- You buy the generated electricity, not the solar system.
- The tariff is fixed or slightly escalated for the contract period (generally 10-25 years).
- You pay only for the energy you consume, with no capital expenditure.
Key Features of a PPA:
- Zero upfront investment
- Fixed per-unit cost (lower than grid tariff)
- Full O&M handled by the developer
- Ideal for commercial and industrial (C&I) consumers
- Helps reduce operational expenses immediately
A PPA is perfect for industries wanting to cut energy bills without owning the asset or managing solar installation charges, system upkeep, or performance risks.
What is the BOOT (Build-Own-Operate-Transfer) Model?
The BOOT model (Build-Own-Operate-Transfer) is a long-duration solar agreement where the developer:
- Builds the solar plant
- Owns it for the contract period
- Operates it and supplies power
- Transfers ownership to the consumer at the end
This transfer clause is the major difference between BOOT & PPA.
After 15-25 years, the entire plant becomes your asset, without paying the full cost upfront.
Key Features of BOOT:
- Zero or minimal upfront investment
- Lower tariffs compared to the grid
- You ultimately own the system
- O&M is fully managed during the tenure
- Perfect for long-term sustainability planning
BOOT is a hybrid of OPEX and CAPEX, giving you the flexibility of PPA today and ownership tomorrow.
PPA vs BOOT: What’s the Difference?
Feature | PPA Model | BOOT Model |
Upfront Cost | ₹0 | ₹0 or minimal |
Ownership | Developer owns the system | Developer owns it initially, then transfers it to you |
Tariff | Fixed per unit | Fixed per unit (often slightly lower for long tenures) |
O&M Responsibility | Developer | Developer until transfer |
Ideal for | Short & Medium-term users | Long-term users want ownership |
Asset Transfer | No | Yes |
Benefits of PPA & BOOT Solar Models for Commercial & Industrial Users
1. Zero Capital Investment
Both models eliminate the need to pay the solar module price per watt, mounting structure cost, inverter cost, or solar panel system cost upfront.
2. Immediate Savings
Since the tariff is lower than the grid, companies see a quick reduction in energy bills.
3. Hassle-Free O&M
Developers manage everything, including cleaning, preventive maintenance, module testing, safety, and monitoring.
4. Predictable Energy Costs
Fixed tariffs help industries plan their financials for 15–25 years.
5. Support ESG & Green Goals
Using renewable energy technology improves sustainability scores and reduces carbon footprint.
How to Choose the Right Model?
Here are key decision points:
Choose PPA if you:
- don’t want ownership
- want the lowest possible per-unit tariff
- want zero responsibility for the system
- prefer flexibility in long-term energy planning
Choose BOOT if you:
- want future ownership of the solar plant
- plan to stay in the same facility for 15+ years
- want long-term cost control
- want a valuable asset at the end of the contract
Example Scenario
- A manufacturing company with a 1 MW load
- Under PPA, it pays only per-unit tariff (e.g., ₹4.0-₹4.5/unit)
- Under BOOT, it pays tariff for 15-20 years, after which the entire plant becomes theirs
Both PPA & BOOT solar models minimize solar installation cost per kWh, maximize savings, and reduce dependency on grid tariff hikes
Why Work With Smart Roof Solar?
Smart Roof Solar specializes in delivering both PPA & BOOT solar models solutions customized to your energy needs:
- Complete EPC + O&M services
- Competitive tariffs
- Advanced monitoring systems
- Compliance with ALMM, MNRE & state regulations
- Experience in industrial, commercial, institutional & government projects
Whether you choose PPA or BOOT, we ensure maximum energy output, long-term performance, and simplified installation.
Conclusion
Both PPA & BOOT solar models make solar adoption simple, affordable, and scalable.
For businesses looking for immediate savings, PPA is ideal.
For organisations planning long-term sustainability and asset creation, BOOT is the better choice.
Smart Roof Solar helps you compare both models based on your energy profile, rooftop/land condition, and financial goals, ensuring the best possible solution for your 2025 solar journey.
Switch to clean, economical solar energy with Smart Roof Solar, your trusted EPC partner for high-performance solar projects.
FAQs
Q1. Is the credit score or financial assessment required for PPA or BOOT models?
Ans: Yes, developers usually check the consumer’s financial stability to ensure long-term payment security.
Q2. Can a PPA or BOOT solar plant run without net metering approval?
Ans: Yes, it can operate behind-the-meter, but net metering can significantly improve savings.
Q3. Does GST apply to PPA or BOOT tariffs?
Ans: Yes, applicable GST is added to the per-unit tariff as per prevailing government rules.
Q4. Can battery storage be added under these financing models?
Ans: Yes, hybrid storage solutions can be integrated, but at a separate tariff or cost structure.
Q5. Do PPA and BOOT systems come with insurance coverage?
Ans: Developers ensure the plant during the contract period; after the transfer in BOOT, the owner handles it.
Suggested Articles

How to Improve Solar Panel Performance for Optimal Energy Output
Performance degradation in solar panels reduces energy output over time. This guide explains how to factor in degradation when calculating annual yields, ensuring accurate estimates for residential, commercial, and industrial solar installations.

US Lawmakers Approve Tariffs on Solar Imports from Southeast Asia
US lawmakers vote to restore tariffs on solar imports from Southeast Asia, affecting pricing, supply, and the solar industry landscape.

Benefits of Solar Energy: Why Switching to Solar Makes Sense
Switching to solar energy offers numerous benefits, from lowering electricity bills to reducing your carbon footprint. This guide explores how solar power supports sustainable living, provides cost savings, and creates a cleaner environment for homes, businesses, and industries. Learn why adopting solar energy is not just smart, but essential for a greener future.

Solar Industry Faces Growing Losses from Underperforming Equipment
According to the Raptor Maps’ Global Solar Report, the amount of power loss due to equipment anomalies has nearly doubled from 1.61% in 2019 to 3.13% in 2022. This trend is expected to continue, with anomaly-driven power loss potentially growing to almost 6% by 2025.

UPNEDA Solar Subsidy 2025: How to Maximize Savings on Rooftop Solar
Discover how the UPNEDA Solar Subsidy 2025 can help you cut electricity costs and make rooftop solar more affordable. Learn about eligibility, subsidy rates, and the step-by-step application process.

UP Discoms Propose 9.21% Electricity Tariff Hike for 2015-16
Uttar Pradesh Discoms propose a 9.21% increase in electricity tariffs for 2015-16, impacting residential, commercial, and industrial consumers across the state.

CAPEX or OPEX? How to Choose the Best Solar Ownership Model
Choosing between the CAPEX and OPEX models can greatly impact your solar savings and ownership benefits. This guide explains both models to help you make the right decision.

6 Upcoming Renewable Energy Events in India You Should Attend
The World Environment Expo, 2022 is a business platform that allows national and international equipment