BOOT vs PPA Explained: Find the Best Way to Finance Your Solar Plant
BOOT vs PPA Explained: Find the Best Way to Finance Your Solar Plant
As solar adoption grows across India, more businesses, industries, institutions, and large consumers are shifting from traditional ownership models to smart financing options. Two of the most widely used mechanisms in 2025 are the PPA & BOOT Solar Models.
Both models help organizations reduce upfront solar installation cost, enjoy clean solar electricity, and make solar energy economical without worrying about maintenance or equipment ownership. But the way they operate, and the long-term benefits, vary significantly.
This blog breaks down both models in simple language to help you choose what’s best for your energy needs.
What is the PPA (Power Purchase Agreement) Model?
A Power Purchase Agreement (PPA) is a long-term contract between the consumer and a solar developer.
Under this model:
- The developer installs, owns, and operates the solar plant on your premises.
- You buy the generated electricity, not the solar system.
- The tariff is fixed or slightly escalated for the contract period (generally 10-25 years).
- You pay only for the energy you consume, with no capital expenditure.
Key Features of a PPA:
- Zero upfront investment
- Fixed per-unit cost (lower than grid tariff)
- Full O&M handled by the developer
- Ideal for commercial and industrial (C&I) consumers
- Helps reduce operational expenses immediately
A PPA is perfect for industries wanting to cut energy bills without owning the asset or managing solar installation charges, system upkeep, or performance risks.
What is the BOOT (Build-Own-Operate-Transfer) Model?
The BOOT model (Build-Own-Operate-Transfer) is a long-duration solar agreement where the developer:
- Builds the solar plant
- Owns it for the contract period
- Operates it and supplies power
- Transfers ownership to the consumer at the end
This transfer clause is the major difference between BOOT & PPA.
After 15-25 years, the entire plant becomes your asset, without paying the full cost upfront.
Key Features of BOOT:
- Zero or minimal upfront investment
- Lower tariffs compared to the grid
- You ultimately own the system
- O&M is fully managed during the tenure
- Perfect for long-term sustainability planning
BOOT is a hybrid of OPEX and CAPEX, giving you the flexibility of PPA today and ownership tomorrow.
PPA vs BOOT: What’s the Difference?
Feature | PPA Model | BOOT Model |
Upfront Cost | ₹0 | ₹0 or minimal |
Ownership | Developer owns the system | Developer owns it initially, then transfers it to you |
Tariff | Fixed per unit | Fixed per unit (often slightly lower for long tenures) |
O&M Responsibility | Developer | Developer until transfer |
Ideal for | Short & Medium-term users | Long-term users want ownership |
Asset Transfer | No | Yes |
Benefits of PPA & BOOT Solar Models for Commercial & Industrial Users
1. Zero Capital Investment
Both models eliminate the need to pay the solar module price per watt, mounting structure cost, inverter cost, or solar panel system cost upfront.
2. Immediate Savings
Since the tariff is lower than the grid, companies see a quick reduction in energy bills.
3. Hassle-Free O&M
Developers manage everything, including cleaning, preventive maintenance, module testing, safety, and monitoring.
4. Predictable Energy Costs
Fixed tariffs help industries plan their financials for 15–25 years.
5. Support ESG & Green Goals
Using renewable energy technology improves sustainability scores and reduces carbon footprint.
How to Choose the Right Model?
Here are key decision points:
Choose PPA if you:
- don’t want ownership
- want the lowest possible per-unit tariff
- want zero responsibility for the system
- prefer flexibility in long-term energy planning
Choose BOOT if you:
- want future ownership of the solar plant
- plan to stay in the same facility for 15+ years
- want long-term cost control
- want a valuable asset at the end of the contract
Example Scenario
- A manufacturing company with a 1 MW load
- Under PPA, it pays only per-unit tariff (e.g., ₹4.0-₹4.5/unit)
- Under BOOT, it pays tariff for 15-20 years, after which the entire plant becomes theirs
Both PPA & BOOT solar models minimize solar installation cost per kWh, maximize savings, and reduce dependency on grid tariff hikes
Why Work With Smart Roof Solar?
Smart Roof Solar specializes in delivering both PPA & BOOT solar models solutions customized to your energy needs:
- Complete EPC + O&M services
- Competitive tariffs
- Advanced monitoring systems
- Compliance with ALMM, MNRE & state regulations
- Experience in industrial, commercial, institutional & government projects
Whether you choose PPA or BOOT, we ensure maximum energy output, long-term performance, and simplified installation.
Conclusion
Both PPA & BOOT solar models make solar adoption simple, affordable, and scalable.
For businesses looking for immediate savings, PPA is ideal.
For organisations planning long-term sustainability and asset creation, BOOT is the better choice.
Smart Roof Solar helps you compare both models based on your energy profile, rooftop/land condition, and financial goals, ensuring the best possible solution for your 2025 solar journey.
Switch to clean, economical solar energy with Smart Roof Solar, your trusted EPC partner for high-performance solar projects.
FAQs
Q1. Is the credit score or financial assessment required for PPA or BOOT models?
Ans: Yes, developers usually check the consumer’s financial stability to ensure long-term payment security.
Q2. Can a PPA or BOOT solar plant run without net metering approval?
Ans: Yes, it can operate behind-the-meter, but net metering can significantly improve savings.
Q3. Does GST apply to PPA or BOOT tariffs?
Ans: Yes, applicable GST is added to the per-unit tariff as per prevailing government rules.
Q4. Can battery storage be added under these financing models?
Ans: Yes, hybrid storage solutions can be integrated, but at a separate tariff or cost structure.
Q5. Do PPA and BOOT systems come with insurance coverage?
Ans: Developers ensure the plant during the contract period; after the transfer in BOOT, the owner handles it.
Suggested Articles

Solar String Sizing Check: Did Your Installer Get It Right?
Worried your rooftop solar strings might be sized incorrectly? Check these tips to ensure your Solar PV system is installed for maximum efficiency and safety

Top 10 Sustainable Building Practices to Consider for Your Construction Business
The construction industry is embracing sustainability like never before. From smart design to renewable energy use, these top 10 practices ensure businesses stay competitive, compliant, and environmentally responsible.

1 MW Solar Power Plant Cost in Rajasthan: A Complete Guide
A detailed guide on the cost of setting up a 1 MW solar power plant in Rajasthan. Learn about pricing, EPC components, land needs, subsidies, and expected payback for commercial and industrial users.

Solar Energy Myths vs. Facts: What You Should Know
Solar power myths often mislead homeowners. Learn the facts about cost, efficiency, and reliability of solar energy.

What Is an Array Junction Box in Solar PV Modules? | Complete Guide
The Array Junction Box (AJB) is a critical component in solar PV systems, connecting multiple solar modules and ensuring safe flow of electricity to the inverter. This blog explains what an AJB is, its key features, types, and why it is essential for both residential and commercial solar installations. Understand how AJBs protect your system from overload, short circuits, and environmental factors while maintaining optimal performance.

Everything You Need to Know About Solar PV Modules
Solar PV modules explained: how they generate electricity, their benefits, and why they’re key to renewable energy growth.

Updated Rates of Solar Subsidy in Delhi: Cost, Eligibility & Benefits
Discover the latest solar subsidy rates in Delhi for 2025. This guide explains the updated costs, eligibility criteria, and benefits to help you maximize savings on your rooftop solar installation.

Minimum Land Requirement for Solar Power Plants in India
Understanding the land requirement for solar plant projects in India is essential for accurate planning and approvals. This article explains minimum land needed per kW and MW, key influencing factors, and differences between rooftop and ground-mounted solar plants.